| The electrical lines were dug underground from the main electrical station to the temple. |
| The windows are added. |
| The windows in the back. |
| Spray foam insulation inside. |
![]() |
| Eventually, we want to have a custom stain glass window of a Dharma Wheel replace the round window. |


No comments:
Post a Comment