Monday

July 2011: Exterior Paint and Interior Sheetrock

Exterior mesh is applied for the stucco.

Interior sheetrock around the timberframing.

Exterior painting completed.

Lama Dawa Rinpoche inspects the interior sheetrocking.


No comments:

Post a Comment